Hiring a painter does not end with signing the estimate. The part that most often raises doubts for property owners in Spain usually comes afterwards: what happens if the work is delayed, if a damp problem appears behind the gotelé, or if the final finish does not match what was agreed. This guide focuses on that intermediate phase, the one from when the work begins until it is verified and the final balance is paid.
What to do if the painter is delayed
When a delay stops being reasonable
Not all delays carry the same weight. A couple of days due to bad weather on a façade or a one-off unexpected issue is different from work stopping without explanation for weeks. According to construction law specialists, if the agreed deadline is exceeded without a valid reason, it can be considered a contractual breach, which opens the door to a formal claim.
In practice, before talking about breach it is worth asking whether the agreed deadline was realistic for the scope of the work (complete flats, façades with scaffolding, premises with restricted hours) and whether the delay has a documented cause, such as prolonged rain or a damp problem discovered when removing the gotelé.
How to claim without going to court
If the delay is already significant, it is advisable to:
- Gather evidence of the state of the work with dated photos and messages exchanged with the professional.
- Send a written communication requesting a specific completion date.
- Allow a reasonable period for remedy before considering other options.
Legal experts in renovations point out that, if an amicable agreement cannot be reached, it is advisable to send a letter by a reliable means, such as a registered letter, before taking other action1, documenting the breach of the deadline. On our platform, since all the scope and agreed dates are visible online to the client, the professional and the platform, it is easier to demonstrate what was originally agreed and to detect a real deviation.
Common unexpected issues during a painting job
Damp, cracks and surprises under the gotelé
It is common that when you start sanding or removing the gotelé2 (sprayed textured coating typical of many Spanish homes), a crack or damp stain appears that was not visible before. This does not mean that the initial estimate was poorly done: a per-square-metre estimate is always indicative, because two walls with the same surface area can be in very different states. The final price can only be confirmed once the real state of the surface is assessed, either through photos and videos or a visit. That is why on our platform we always request photos and videos of the surfaces before finalising any estimate, precisely to reduce surprises mid-work.
Scope changes as work progresses
Another common unexpected issue is that, once work has started, the client decides to add a room, change a colour or include the ceiling in the gotelé treatment3. Any change of this kind must be reflected in writing before it is carried out, to avoid disputes about what was included in the original price and what was added afterwards.
| Type of unexpected issue | What to do | Where it is recorded |
|---|---|---|
| Delay in schedule | Request new date in writing | Messages and online agreement |
| Damp or cracks under the gotelé | Re-evaluate with photos/videos or visit | Dated photos, revised estimate |
| Change in scope (more rooms, ceilings) | Confirm additional price before execution | Updated scope on the platform |
| Final finish different from what was agreed | Verify before paying the balance | Reception checklist |
Verify the work before final payment
What to check when the work is finished
Before considering the work complete, it is worth carrying out a proper inspection, just as you would with any other renovation. Lawyers who handle claims for poorly executed work recommend documenting with dated photographs the state of the work4 at the time of delivery, as a reference in case any discrepancy arises later.
Some points to check:
- That the colour and finish (matte, satin, etc.) match what was agreed.
- That there are no stains, drips or uncovered areas, checking with raking light, especially on ceilings.
- That the protection of floors, furniture and joinery has been removed, and that final cleaning has been done.
- That the areas where the gotelé was treated are smooth and without visible residual textures.
How payment works on our platform
The payment scheme on our platform is always the same: 50% at the start, to reserve the date and buy materials, and the remaining 50% at the end, once the work is verified. This allows time to review the result before releasing the balance, without needing to pay the full amount upfront or to manually negotiate a different distribution with the professional.
What to do if a defect appears after painting
Sometimes the problem is not detected on the day of delivery, but weeks later: a stain that reappears, a crack that opens again or peeling in a specific area. If this happens, the first step is to photograph the defect with the date and describe it clearly, then contact the professional directly through the platform, where the originally agreed scope is recorded. If the defect is related to a damp problem not resolved before painting, it may be necessary to address that cause first (for example, with a damp removal service5) before repainting the affected area.
Frequently Asked Questions
If the delay is significant and there is no justified reason, it can be considered a breach of the agreement and you can consider terminating the contract. Before reaching that point, it is advisable to give a reasonable period for remedy in writing and to keep a record of attempts to contact.
It is a common unexpected issue, especially when removing old gotelé or deteriorated paint. In this case, the original estimate should be revised with photos and videos of the affected area, or with a visit, before proceeding with the work.
No. On our platform payment is divided into two parts: 50% at the start to reserve the date and materials, and the remaining 50% at the end, once it is verified that the work has been done as agreed.
It is worth reviewing the agreed colour and finish, the absence of stains or poorly covered areas with raking light, and that all protection and waste has been removed. If the work included removing gotelé, you should also check that the surface was left smooth before the final paint.
Yes, but any change (more rooms, including ceilings, changing colour) must be reflected in writing with the agreed additional price before it is executed, to avoid confusion about what was included in the initial estimate.
Ready to paint?
Get free quotes from verified local painters in minutes. No commitment.
Sources
External sources open in a new tab.
- Retraso de obras y reformas: plazos y reclamacióntreskabogadas.es
- Gotelé en casa: cómo decidir si quitarlo, alisarlo o taparlomyfixio.es
- Eliminación de Gotelémyfixio.es
- Cómo reclamar por retrasos en la entrega de una obra - Abogados Derecho Civil y Laboral en Madridabogadosdagesa.es
- Eliminación de Humedadmyfixio.es